AHU-01 North Wing

Air Handling Unit · Trane M-Series Climate Changer · Rooftop North · Riverside Office Complex

Condition — Last 14 Days

Peak Vibration
5.6mm/s
Avg while running 4 mm/sStaticDev
Peak Filter ΔP
77Pa
StaticDev
Peak Bearing Temp
56.7°C
StaticDev
Energy
432kWh
138 run-hours
Alarms
1
1 unresolved

Electrical Demand

15-minute power draw, kW — last 14 days

VibrationStaticDev

15-minute readings, mm/s RMS — last 14 days

Air Temperatures

Supply air vs. outdoor air, °C — last 14 days

Zone CO₂StaticDev

Worst zone, ppm — last 14 days

Nameplate & Ratings

Asset ID
AHU-01
Asset type
Air Handling Unit
Manufacturer
Trane
Model
M-Series Climate Changer
Rated motor
7.5 kW
Rated airflow
8,000 CFM
Served zones
2
Heat-recovery wheel
Yes
CHW coil design flow
47 GPM
HW coil design flow
36 GPM
Installed
Jun 15, 2019
Last major service
Apr 14, 2026

Fault History

F-VIB-HIGHWARNING
Jul 2, 2026, 6:45 a.m. · unresolved

Supply fan vibration crossed warning threshold (5.0 mm/s). Reading: 5.06 mm/s. Rapid onset over ~10 days suggests belt wear or sheave misalignment - inspect drive assembly.

F-LOW-DATWARNING
Jan 21, 2026, 7:30 a.m. · cleared Jan 21, 2026, 8:30 a.m.

Discharge air temperature 11.4 C below setpoint during extreme cold (OA -13.5 C). HW valve response verified; condition self-recovered as coil load stabilized.

Service History

ACTUATOR RECALIBRATION$260.00
Condition-basedMay 8, 2026, 3:00 p.m. · S. Whitfield · 30 min downtime

Triggered by: Analytics: OA damper averaging ~30% open during free-cooling conditions (expected ~70%); no alarm raised

Economizer OA damper actuator recalibrated - feedback signal had drifted ~35% low, so the damper under-delivered outdoor air during economizer operation. Free-cooling stroke verified at commanded 70%.

PREVENTIVE INSPECTION$540.00
PreventiveApr 14, 2026, 8:30 a.m. · M. Lavoie · 45 min downtime

Triggered by: Scheduled quarterly PM (calendar)

Q2 preventive inspection incl. scheduled MERV-13 filter bank replacement (pre-change DP 88 Pa). Coils cleaned, condensate pan treated, sensors calibrated.

PREVENTIVE INSPECTION$320.00
PreventiveJan 15, 2026, 8:30 a.m. · M. Lavoie · 0 min downtime

Triggered by: Scheduled quarterly PM (calendar)

Q1 preventive inspection. Belt tension OK. Heat-recovery wheel seals inspected. Filter DP 62 Pa - within spec. Freeze-stat tested OK.