Service Events
17
6 corrective
Total Cost
$10,870.00
Downtime
1,330min
StaticDev
Corrective Share
35%
Unplanned work vs. total — lower is betterStaticDev

Work by CategoryStaticDev

CategoryEventsCost (CAD)Downtime (min)
Preventive7$3,295.00165
Predictive1$450.000
Condition-based3$2,090.00330
Corrective6$5,035.00835

Cost & Downtime by Asset

AssetEventsCorrectiveCost (CAD)Downtime (min)
AHU-0130$1,120.0075
AHU-0243$1,625.00325
AHU-0331$3,685.00330
AHU-0410$340.000
AHU-0510$300.0030
BLR-0111$980.00300
BLR-0211$260.0090
CH-0120$1,870.00180
CH-0210$690.000

Service Ledger

Triggered ByNotes
Jun 25, 2026, 7:00 a.m.AHU-03Bearing ReplacementCorrectiveF-OVERCURRENTOvercurrent trip sequence F-OVERCURRENT x3 (2026-06-24) - bearing seizureJ. TremblayEmergency replacement of supply fan motor bearings (DE and NDE). DE bearing showed brinelling. Vibration post-repair: 2.4 mm/s (within spec).$2,850.00240
Jun 19, 2026, 8:00 a.m.CH-01Condenser CleaningCondition-basedF-COP-LOWAnalytics: COP trending 20%+ below expected; F-COP-LOW warning and heat-wave high-pressure trip F-HP-TRIPR. OseiCondenser coils chemically cleaned and rinsed; approach temperature restored to design. COP back to ~5.2 at part load.$1,150.00180
Jun 6, 2026, 9:00 a.m.AHU-02Filter ChangeCorrectiveF-HIGH-STATICHigh-static trip F-HIGH-STATIC (2026-06-03); filter DP warning active since 2026-05-22M. LavoieEmergency Saturday call-out following high-static trip. Replaced primary MERV-13 filter bank. Pre-change DP 262 Pa (rated max 250 Pa). Coil inspection clean.$245.0025
May 8, 2026, 3:00 p.m.AHU-01Actuator RecalibrationCondition-basedAnalytics: OA damper averaging ~30% open during free-cooling conditions (expected ~70%); no alarm raisedS. WhitfieldEconomizer OA damper actuator recalibrated - feedback signal had drifted ~35% low, so the damper under-delivered outdoor air during economizer operation. Free-cooling stroke verified at commanded 70%.$260.0030
May 5, 2026, 10:00 a.m.AHU-03Vibration AnalysisPredictiveF-VIB-HIGHF-VIB-HIGH warning (2026-05-01) and rising vibration trendJ. TremblayVibration spectrum analysis: outer-race defect frequencies on DE bearing. Recommended bearing replacement at next available window; interim weekly monitoring.$450.000
Apr 24, 2026, 9:00 a.m.CH-02Seasonal StartupPreventiveScheduled spring chiller start-up (calendar)R. OseiSpring start-up: charge and approach temperatures within design. No leaks.$690.000
Apr 21, 2026, 9:00 a.m.CH-01Seasonal StartupPreventiveScheduled spring chiller start-up (calendar)R. OseiSpring start-up: refrigerant charge verified, oil analysis clean, safeties tested.$720.000
Apr 14, 2026, 8:30 a.m.AHU-01Preventive InspectionPreventiveScheduled quarterly PM (calendar)M. LavoieQ2 preventive inspection incl. scheduled MERV-13 filter bank replacement (pre-change DP 88 Pa). Coils cleaned, condensate pan treated, sensors calibrated.$540.0045
Apr 10, 2026, 9:00 a.m.AHU-02Erw Seal ServiceCondition-basedCondition monitoring: energy-wheel sensible effectiveness trending down 70% -> ~56% (action level 62%)M. LavoieEnergy-recovery wheel brush seals replaced and matrix cleaned. Post-service sensible effectiveness restored to ~70% (design).$680.00120
Mar 25, 2026, 8:30 a.m.AHU-05Preventive InspectionPreventiveScheduled quarterly PM (calendar)J. TremblayQ1 preventive inspection. Belt retensioned; condensate drain flushed.$300.0030
Mar 20, 2026, 8:00 a.m.BLR-01Burner ServiceCorrectiveF-FLUE-TEMPFlue-gas temperature warning F-FLUE-TEMP (2026-03-12); combustion efficiency trending 94% -> ~86%K. DominguezHeat exchanger descaled, burner tuned and combustion analyzed. Efficiency restored to ~94%; flue temperature back to design.$980.00300
Mar 10, 2026, 9:00 a.m.AHU-03Belt AlignmentPreventiveScheduled annual drive service (calendar)J. TremblayDrive belt replaced and sheaves re-aligned. Noted elevated broadband vibration on DE bearing (3.4 mm/s); recommended vibration analysis at next PM.$385.0090
Page 1 of 2