Operations Overview

4 buildings · 12 monitored assets · data through Jul 5, 2026, 11:45 p.m.

Alarm Insights — Jun 5, 2026 – Jul 5, 2026StaticDev

7 alarms recorded across 3 assetsmost frequent: VFD overcurrent trip (3×) · most affected: AHU-03 Production Hall (4 alarms)
Critical
1critical alarms

1 alarm type in window

Medium
4trip alarms

2 alarm types in window

Low
2warning alarms

2 alarm types in window

Most Severe in This Window

Critical · F-VIB-CRIT1 occurrence in window · last Jun 17, 2026, 6:30 p.m.

Fan vibration critical

AHU-03 Production HallStale

Takeaway: Remained active 7.5 days before clearing — review response and escalation time.

May relate to: Short-cycling (repeated restarts) — see Detected Conditions below.

Trip · F-OVERCURRENT3 occurrences in window · last Jun 24, 2026, 2:30 p.m.

VFD overcurrent trip

AHU-03 Production HallChattering

Takeaway: Resolved by Bearing Replacement on Jun 25, 2026. Annunciated 3× in a single day — the condition was oscillating at its limit; address the root cause rather than re-acknowledging.

May relate to: Short-cycling (repeated restarts) — see Detected Conditions below.

Work order: bearing replacement · Jun 25, 2026

Trip · F-HP-TRIP1 occurrence in window · last Jun 18, 2026, 2:30 p.m.

Chiller high-pressure trip

CH-01 Central Chiller

Takeaway: Cleared in 1.5 h without a linked work order.

May relate to: Chiller efficiency below expected (COP) · Plant energy above weather-normal — see Detected Conditions below.

All Alarms · 5 alarm types

Detected Conditions — Jun 5, 2026 – Jul 5, 2026StaticDev

Asset Health report →

Asset Alarm & Service History — Jun 5, 2026 – Jul 5, 2026

Asset registry →

Performance Summary — Jun 5, 2026 – Jul 5, 2026

Daily Electrical Energy by Asset

kWh consumed per day

Daily Cost by Rate Period

Ontario time-of-use, CAD per day

Recent Activity — 14 Days

Fault report →
Operational Shortfalls — trips, failures & critical alarms3 entries
F-OVERCURRENTTRIPAHU-03 · Jun 24, 2026, 2:30 p.m.

VFD overcurrent protection tripped (trip 3 of the day). Current at trip: 18.5 A. Vibration: 7.29 mm/s. Third trip - unit held out of service pending bearing replacement.

F-OVERCURRENTTRIPAHU-03 · Jun 24, 2026, 12:45 p.m.

VFD overcurrent protection tripped (trip 2 of the day). Current at trip: 17.7 A. Vibration: 7.23 mm/s. Second trip after reset. Vibration severely elevated.

F-OVERCURRENTTRIPAHU-03 · Jun 24, 2026, 11:00 a.m.

VFD overcurrent protection tripped (trip 1 of the day). Current at trip: 16.2 A. Vibration: 7.21 mm/s. Operator reset after inspection; no obstruction found.

Early Warnings1 entry
F-VIB-HIGHWARNINGAHU-01 · Jul 2, 2026, 6:45 a.m.

Supply fan vibration crossed warning threshold (5.0 mm/s). Reading: 5.06 mm/s. Rapid onset over ~10 days suggests belt wear or sheave misalignment - inspect drive assembly.

Maintenance & Service1 entry
BEARING REPLACEMENTAHU-03 · Jun 25, 2026, 7:00 a.m. · J. Tremblay

Emergency replacement of supply fan motor bearings (DE and NDE). DE bearing showed brinelling. Vibration post-repair: 2.4 mm/s (within spec).