AHU-03 Production Hall

Air Handling Unit · Carrier 39M Modular AHU · Mechanical Penthouse · Riverside Office Complex

Condition — Last 14 Days

Peak Vibration
7.3mm/s
Avg while running 3.6 mm/sStaticDev
Peak Filter ΔP
145Pa
StaticDev
Peak Bearing Temp
78.4°C
StaticDev
Energy
639kWh
132 run-hours
Alarms
3
None unresolved

Electrical Demand

15-minute power draw, kW — last 14 days

VibrationStaticDev

15-minute readings, mm/s RMS — last 14 days

Air Temperatures

Supply air vs. outdoor air, °C — last 14 days

Zone CO₂StaticDev

Worst zone, ppm — last 14 days

Nameplate & Ratings

Asset ID
AHU-03
Asset type
Air Handling Unit
Manufacturer
Carrier
Model
39M Modular AHU
Rated motor
11 kW
Rated airflow
12,000 CFM
Served zones
2
Heat-recovery wheel
Yes
CHW coil design flow
71 GPM
HW coil design flow
55 GPM
Installed
Aug 22, 2017
Last major service
Sep 5, 2025

Fault History

F-OVERCURRENTTRIP
Jun 24, 2026, 2:30 p.m. · cleared Jun 25, 2026, 7:00 a.m.

VFD overcurrent protection tripped (trip 3 of the day). Current at trip: 18.5 A. Vibration: 7.29 mm/s. Third trip - unit held out of service pending bearing replacement.

F-OVERCURRENTTRIP
Jun 24, 2026, 12:45 p.m. · cleared Jun 24, 2026, 1:15 p.m.

VFD overcurrent protection tripped (trip 2 of the day). Current at trip: 17.7 A. Vibration: 7.23 mm/s. Second trip after reset. Vibration severely elevated.

F-OVERCURRENTTRIP
Jun 24, 2026, 11:00 a.m. · cleared Jun 24, 2026, 11:30 a.m.

VFD overcurrent protection tripped (trip 1 of the day). Current at trip: 16.2 A. Vibration: 7.21 mm/s. Operator reset after inspection; no obstruction found.

F-VIB-CRITCRITICAL
Jun 17, 2026, 6:30 p.m. · cleared Jun 25, 2026, 7:00 a.m.

Supply fan vibration crossed critical threshold (7.0 mm/s). Reading: 7.01 mm/s. Schedule immediate maintenance.

F-VIB-HIGHWARNING
May 1, 2026, 11:30 a.m. · cleared Jun 25, 2026, 7:00 a.m.

Supply fan vibration crossed warning threshold (5.0 mm/s). Reading: 5.01 mm/s. Recommend bearing inspection.

Service History

BEARING REPLACEMENT$2,850.00
CorrectiveJun 25, 2026, 7:00 a.m. · J. Tremblay · 240 min downtime

Triggered by: F-OVERCURRENT — Overcurrent trip sequence F-OVERCURRENT x3 (2026-06-24) - bearing seizure

Emergency replacement of supply fan motor bearings (DE and NDE). DE bearing showed brinelling. Vibration post-repair: 2.4 mm/s (within spec).

VIBRATION ANALYSIS$450.00
PredictiveMay 5, 2026, 10:00 a.m. · J. Tremblay · 0 min downtime

Triggered by: F-VIB-HIGH — F-VIB-HIGH warning (2026-05-01) and rising vibration trend

Vibration spectrum analysis: outer-race defect frequencies on DE bearing. Recommended bearing replacement at next available window; interim weekly monitoring.

BELT ALIGNMENT$385.00
PreventiveMar 10, 2026, 9:00 a.m. · J. Tremblay · 90 min downtime

Triggered by: Scheduled annual drive service (calendar)

Drive belt replaced and sheaves re-aligned. Noted elevated broadband vibration on DE bearing (3.4 mm/s); recommended vibration analysis at next PM.