CH-02 South Chiller

Chiller · Trane Sintesis RTAF Air-Cooled Chiller · Plant Room A · South Windsor Distribution Centre

Condition — Last 14 Days

Peak Vibration
2.1mm/s
Avg while running 1.7 mm/sStaticDev
Peak Bearing Temp
58.8°C
StaticDev
Energy
5,189kWh
138 run-hours
Alarms
0
None unresolved

Electrical Demand

15-minute power draw, kW — last 14 days

VibrationStaticDev

15-minute readings, mm/s RMS — last 14 days

Nameplate & Ratings

Asset ID
CH-02
Asset type
Chiller
Manufacturer
Trane
Model
Sintesis RTAF Air-Cooled Chiller
Rated motor
52 kW
Rated airflow
0 CFM
Served zones
0
Heat-recovery wheel
No
CHW coil design flow
190 GPM
HW coil design flow
0 GPM
Installed
Apr 19, 2022
Last major service
Apr 24, 2026

Fault History

No faults recorded.

Service History

SEASONAL STARTUP$690.00
PreventiveApr 24, 2026, 9:00 a.m. · R. Osei · 0 min downtime

Triggered by: Scheduled spring chiller start-up (calendar)

Spring start-up: charge and approach temperatures within design. No leaks.